Elevator system
● First to use through destination elevator system;
● Shorter waiting time with world famous Schindler intelligent elevators;
● 6 high-level elevators, 6 low-level elevators and 1 fire-fighting service elevator each tower building;
Air conditioning system
● First to adopt underfloor air distributing system according to human dynamic principle;
● The fresh air is 36 cubic meters per hour per person;

Power system
● Two-line-and-one-spare KV power supply, 104 VA/ cubic meter. It can resume electricity 5 minutes after power break so as to make certain of normal operation of all public facilities (elevators, fire-fighting facilities and public lighting facilities). It can continuously provide electricity within 8 hours after one break.
● Voltage 380V with 50 HZ and 220V with 50 HZ.
PDS(Premises Distribution System)
● Total 9593 information points (237 fiber points, 4,738 data points and 4,618 sound points)
Security system
● Can monitor 2,125 spots with BAS automatic monitoring system and access system;
● All security staffs are veterans who have received professional trainings.
Water supply system
● There are two living reservoirs of 200 cubic meters, which separately locates in the second underground floor at south & north tower buildings. They can continuously provide water for 6 hours if there is a break for public water.
Load Limit of floors
● 250 kgs per square meter
Anti-wind ability
● Wind load of 500 kgs per square meter
|